References > Forklift Service, Pirtó
Work content: General executing
Description: Pre-fabricated reinforced concrete and steel frame forklift service and offices.
Year: 2013
Area: 1 000 m2
Client: T & K Logistics Ltd.
Our firm won a tender for general executing a small area service and office building. Before starting work however, a full re-design became necessary in order to make executing possible given the funds. The pre-fabricated reinforced concrete building was made rather spectacular with simplified form and colour use.